On this page
Read the purchasing team’s rules and common mistakes before your first requisition to avoid having it returned for correction.
Use one supplier per requisition
Each requisition must contain only one supplier. If you need two suppliers, finish and submit the first requisition before starting the second.
Choose the right route
| Route | When to use it | Where to start | Guide |
|---|---|---|---|
| Price list | The supplier’s item and price already exist in the system | Search in Purchase Requisitions | Price-list ordering |
| Quote | You have a supplier quote, or need warehouse stock | More Tasks → Enter Requisition Line | Local purchasing, warehouse orders |
| Payment without imports | Bank transfer or credit-card payment without importing goods | Select the appropriate Request Form | Bank transfer, credit card |
Search price lists with %
Put % before and after the search term. For example, %מחשב% finds computers in the Hebrew price lists. Press Enter, enter a quantity and click the cart icon next to the item.
Complete requisition lines correctly
For purchases based on a quote, check these fields:
- Item Description — replace any automatically inserted university item description with the description from the quote.
- Category Name — required.
- Item Number — use only for hazardous materials or warehouse stock; otherwise leave it blank.
- Unit of Measure — required.
- Supplier — choose from the list to fill the remaining details automatically. Leave it blank if the supplier is not listed.
- Research or Teaching Input — select the appropriate answer.
- Budget — use the account icon to select an account. You can set default requisition preferences first.
There are three note fields: Note to Buyer is internal, Note to Supplier is printed on the purchase order, and Note to Receiver is for the recipient.
Select an attribute value for every line
The Attribute Value field is required on every line:
- Hazardous Materials — for hazardous materials.
- Import or Export — as appropriate.
- Transportation — for buses.
- Other — for remaining purchases; this is the usual selection.

Hazardous materials require the exact packaging item number, confirmation that you read and understood the SDS risks, and the laboratory name and code. The Safety Department creates a new item number if needed. See ordering hazardous materials.
Use a separate line for each bus
Never combine two buses on one requisition line.
- Search by seats, distance and hours.
- Supply the arrival time, pickup location, exact route, and trip coordinator’s name and phone.
- Add separate items for extra kilometres, hours or Highway 6 charges. Highway 6 payment needs its own line.
- After adding to the cart and clicking Review, set Attribute Value to Transportation.
Check three requirements before submitting
Open the cart and click Review. Before Submit, confirm:
- Recipient’s mobile number is correct.
- Attribute Value is selected on every line.
- The official supplier quote is attached as a PDF. This is required except for price-list purchases or internal purchasing.
Allow up to 10 minutes after submission
The system checks the budget, permissions and entries after Submit; this can take up to 10 minutes. A valid request advances automatically. If there is a problem, a notification explains it; correct it and resubmit.

