On this page

If you approve requisitions, set an absence period and choose a substitute. During that period, approval requests go to the substitute alone or to both of you.

Open the worklist

Sign in to Anant, click the bell, then Show All.

Notification bell and Show All link

Click Worklist in the notification window. BPM Worklist opens in a separate window.

Open preferences

In BPM Worklist, click your name beside the arrow and select Preferences.

Worklist link, user name and Preferences menu marked in sequence

Enable an absence period

Under Rules, select Vacation Period:

  1. Select Enable Vacation Period.
  2. Use the calendar buttons to set the Start Date and End Date, including times, then click OK.
Enabled vacation period with start and end dates and reassignment options

Choose reassignment or delegation

Reassign toDelegate to
Who receives requestsSubstitute onlyBoth you and the substitute
Who can approveSubstitute onlyBoth of you
Suitable whenYou will be unavailableYou want to retain the option to approve

Choose the substitute

Click the magnifying glass beside the selected option:

  1. Enter First Name and Last Name, or an Email Address, then click Search.
  2. Select the correct person.
  3. Click OK.
Search window with name fields, Search, a result row and OK

Save

Click Save at the top, beside Back. Requests will go to the substitute during the selected dates.

All purchasing and Anant guides.